Project 20: Nicad

 

4 hours

 
 

Project 4 helpful hints

  • Lorem Ipsim

 

Hoisting of head to remove from aircraft. Remove blades and marking on latches at this time.
Inspection of blade bolts (requires use of optical digital micrometer) and grip bushings

Install Blades (ensure you snug latch bolt upon installing a blade to the grip)
String alignment
Static balance, final torque of latch bolts
Final torque of blade bolts
Installation of rotor head on aircraft, torquing of mast nut, and safetying
Install equipment and explain adjustments for dynamic track and balance on the aircraft
Remove balancing equipment from aircraft
Check for proper storage of balance equipment.
Track and balance of whirly-gig to less than .1 IPS

Next
Next

Project 14: Align and Static Balance